Skip to content Skip to footer

Cross Generating Station 2016

Project Overview

Design, manufacture, and install PSC piles for foundation support of 11 structures. The project schedule dictated that 4000+ piles must be installed in less than 4 months. Palmetto Pile Driving lead a team of 2 casting facilites and 3 pile subcontractors to install the project ahead of schedule.

Project TypeInstallationContractorMB KahnProduct4000+ pcs. @ 12” x 25’ – 35’ PSC pileShare